Skip to content

Trade Catalogue

Everything a practice restocks.

30 listed lines across 6 ranges, with lead times marked ex-stock or indent. Build a request list and we will come back with a written quotation.

Showing 30 of 30 lines

  • Ex-stock

    Single Vision

    Single Vision 1.56 Hard-Coated

    The everyday workhorse of the dispensing bench.

    Lead time
    24–48 hrs
    Supplied in
    pairs
  • Indent

    Progressive

    Progressive 1.60 Free-Form

    Wide corridor, short fitting height.

    Lead time
    4–6 working days
    Supplied in
    pairs
  • Ex-stock

    Blue Light

    Blue Light 1.56 Clear

    Filter without the yellow cast.

    Lead time
    24–48 hrs
    Supplied in
    pairs
  • Ex-stock

    Bifocal

    Bifocal 1.56 Kryptok

    Round-segment bifocal, still dispensed daily.

    Lead time
    24–48 hrs
    Supplied in
    pairs
  • Ex-stock

    Photochromic

    Photochromic 1.56 Grey

    Fades back fast in Islamabad heat.

    Lead time
    48 hrs
    Supplied in
    pairs
  • Ex-stock

    Metal

    Stainless Steel Optical Frame

    Thin profile, nickel-free, spring hinged.

    Lead time
    3–5 working days
    Supplied in
    pieces
  • Ex-stock

    Rimless

    Titanium Rimless Mount

    Beta-titanium, drilled or notched.

    Lead time
    5 working days
    Supplied in
    pieces
  • Ex-stock

    Kids

    TR90 Flexible Kids Frame

    Bends, doesn't break.

    Lead time
    3–5 working days
    Supplied in
    pieces
  • Ex-stock

    Sunwear

    Polarised Sunwear Assortment

    Ready-glazed polarised, retail-tagged.

    Lead time
    3–5 working days
    Supplied in
    pieces
  • Ex-stock

    Cases

    Clamshell Spectacle Case

    Print your practice mark on the lid.

    Lead time
    48 hrs
    Supplied in
    pieces
  • Ex-stock

    Cords & Chains

    Silicone Spectacle Cord

    Grip that survives a Karachi summer.

    Lead time
    48 hrs
    Supplied in
    pieces
  • Ex-stock

    Readers

    Ready Readers Display Pack

    48 readers, one counter spinner.

    Lead time
    3 working days
    Supplied in
    packs
  • Ex-stock

    Blocking

    Edging Blocking Pads

    Consistent tack, no axis slip.

    Lead time
    3 working days
    Supplied in
    packs
  • Indent

    Edging

    Diamond Edging Wheel

    Roughing, finishing and bevel in one stack.

    Lead time
    2–3 weeks
    Supplied in
    pieces
  • Ex-stock

    Tinting & Chemistry

    Lens Tinting Dye Set

    Repeatable shade, batch to batch.

    Lead time
    5 working days
    Supplied in
    sets
  • Ex-stock

    Tinting & Chemistry

    Tint Neutraliser 5 L

    Strip and re-tint without hazing.

    Lead time
    5 working days
    Supplied in
    drums
  • Indent

    Surfacing

    Lens Polishing Compound

    Fine-grade slurry for surfacing.

    Lead time
    2 weeks
    Supplied in
    drums
  • Ex-stock

    Screws & Hardware

    Optical Screw Assortment

    1.2 to 1.6 mm, stainless, labelled.

    Lead time
    48 hrs
    Supplied in
    cases
  • Ex-stock

    Temple Tips

    Temple Tip Assortment

    Slip-on tips for metal and wire temples.

    Lead time
    48 hrs
    Supplied in
    boxes
  • Ex-stock

    Tools

    Optician Workshop Tool Kit

    Everything the bench needs, in one roll.

    Lead time
    5 working days
    Supplied in
    kits
  • Indent

    Charts & Occluders

    LED Vision Chart

    Snellen, LogMAR and paediatric optotypes.

    Lead time
    2–3 weeks
    Supplied in
    pieces
  • Ex-stock

    Charts & Occluders

    Handheld Occluder Set

    Multi-pinhole, Maddox and plain.

    Lead time
    5 working days
    Supplied in
    sets
  • Ex-stock

    Vision Care

    Post-Operative Eye Shields

    Perforated, sterile-packed.

    Lead time
    5 working days
    Supplied in
    packs